Paint Exteriors of warehouses

Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Paint Exteriors of warehouses 14, 15, 17 and 18, DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy, CA 95304.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingDla Distribution, Defense Logistics Agency
WhereTracy, California
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly small businesses can bid
IndustryNAICS 238320 (Painting and Wall Covering Contractors)
Estimated size$1 million to $5 million
Solicitation #SP3300-16-B-0016
PostedWed, Jul 13, 2016
ContactMogen Gilson, [email protected]

Heads-up: Site visit or pre-bid meeting mentioned · Must be registered in SAM.gov

Open the official posting

From the notice

Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Paint Exteriors of warehouses 14, 15, 17 and 18, DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy, CA 95304. The following summary of work is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work. It is expected that the contractor will visit the site of work and thoroughly familiarize himself with the conditions existing there. Failure on the part of the contractor to acquaint himself with the site conditions will not be sufficient reason for any increase in contract price. •1. Project Description: This project is required to repaint the exterior surfaces of four warehouses including surface preparation, primer (where required), and finish coats of paint. The project includes the following work: •a. Repaint concrete walls, exposed metal gas piping, exposed metal piping, metal gutters, metal downspouts, louvers, metal railings and dock stairs, wood dock bumpers, wood trims, wood doors, metal siding, metal pipe bollards, metal ladders, metal personnel doors and frames, metal trims, wooden cargo doors, wood window frames, canopies, and sprinkler system piping under canopies. •b. Repaint sliding and roll-up cargo doors, except those identified on the drawings. •c. Repaint fire department connections (FDC) markings with red paint (4" wide lines and FDC l