FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

Whitney Lake Powerhouse Roof Repairs

Please note this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is required before award.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW076 Endist Ft Worth, Dept of the Army
WhereWork location not listed. The buying office is in Fort Worth, Texas.
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly small businesses can bid
IndustryNAICS 238160 (Roofing Contractors)
Solicitation #W9126G26RA059
PostedWed, Mar 11, 2026
ContactAngelina PinaHardin, [email protected]

Open the official posting

From the notice

THIS IS NOT A REQUEST FOR QUOTE GENERAL INFORMATION: This announcement is a competitive, Firm-Fixed price, Small Business Set-Aside, procured in accordance with FAR Part 36, Construction and Architect-Engineer Contracts to determine best value. Please note this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is required before award. Project Scope: Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform replacement of multiple levels of roofs at the Whitney Dam Powerhouse to include TPO and Standing Seam Metal Roof per the Statement of Work (SOW). The Contractor shall be required to perform within the standards of this contract. This project is to replace the existing metal roof, gutters, and downspouts, at Lake Whitney Powerhouse Generation Bay. The existing metal roof is a Metal Roofing Overbuild on the original low slope roof system, on a concrete deck. The project requires the replacement of the existing metal roof panels, gutters, and down spouts. The existing metal roofing overbuild structural framing system will be reused. The contractor must perform a structural survey of the existing roof overbuild steel framing structure prior to construction. The structural survey must contain sufficient as-built data adequate for

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.