FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Coming soon

Construct Air Traffic Control (ATC) Tower

The scope of this DBB project includes, but is not limited to, the construction of a concrete foundation, steel framing, masonry walls, metal roof, fire detection and suppression systems, HVAC, electrical and telecommunication systems, backup generation, elevator, and all associated utility and…

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW071 Endist Kansas City, Dept of the Army
WhereWork location not listed. The buying office is in Kansas City, Missouri.
DeadlineNo deadline listed. Check the official posting.
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 236220 (Commercial and Institutional Building Construction)
Estimated size$25 million to $100 million
Solicitation #W912DQ26RA061
PostedFri, Jul 17, 2026
ContactDale Coleman, [email protected]

Heads-up: Bonds required (bid / performance / payment) · Site visit or pre-bid meeting mentioned · Must be registered in SAM.gov

Open the official posting

From the notice

**NOTE: This is an update to include the scheduled site visit information Expected solicitation will be issued soon The U.S. Army Corps of Engineers, Kansas City District, intends to solicit and award a single firm-fixed-price Design-Bid-Build (DBB) contract for the construction of a new Air Traffic Control (ATC) Tower. The scope of this DBB project includes, but is not limited to, the construction of a concrete foundation, steel framing, masonry walls, metal roof, fire detection and suppression systems, HVAC, electrical and telecommunication systems, backup generation, elevator, and all associated utility and site work. The project also requires the demolition of the existing ATC Tower and associated structures. Below is the Site Visit information: Date: July 29, 2026 @ 10:00am. Location: 748 Ray Rd Fort Riley, KS 66442 Point of contact site visit issues only: Travis Blinkiewicz Phone (816) 389-2343 Visitor's can go in person to the Ft Riley Visitors Center to get a day pass or online. Info at https://home.army.mil/riley/about/visitor-info . The estimated magnitude of this construction project is: Between $25,000,000.00 and $100,000,000.00. The estimated performance period for completion of construction is 730 calendar days from Notice to Proceed (NTP). Bid bond will be required with your proposal in the amount of 20% of the offeror proposed price or $3,000,000.00 whichever is less. Payment Bond will be required for the full amount (100%) of the awarded contract before the N

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.