FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC

All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buying242-Network Contract Office 02 (36c242), Veterans Affairs, Department of
WhereBath, New York
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly service-disabled veteran-owned small businesses can bid
IndustryNAICS 236220 (Commercial and Institutional Building Construction)
Estimated size$25K to $100K
Solicitation #36C24227B0004
PostedTue, Oct 13, 2026
ContactIdalia Algarin, [email protected]

Heads-up: Bonds required (bid / performance / payment) · Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

Presolicitation Notice Presolicitation Notice Page 3 of 3 Pre Solicitation Notice *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This pre solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76. All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings. As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed. The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equi

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.