FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Sources sought

USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA

This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered.

Notice typeSources Sought: Market research. The agency wants to know who can do this work. Answering is free and can get the job set aside for small businesses.
Who's buyingW075 Endist Sacramento, Dept of the Army
WhereCopperopolis, California
DeadlineMon, Dec 7, 2026 at 11:00 AM EST (45 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 237110 (Water and Sewer Line and Related Structures Construction)
Solicitation #W9123827X1CHG
PostedThu, Oct 8, 2026
ContactConstantinos Laliotitis, [email protected]

Heads-up: Bonds required (bid / performance / payment)

Open the official posting

From the notice

This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for Design-Bid-Build (DBB) construction services to conduct Copper Cove Wastewater Treatment Plant (CCWTP) Improvements in collaboration with the Calaveras County Water District (CCWD) in Calaveras County, California (CA). The project is anticipated to include installation of a new continuous backwash filtration system to replace an existing filter system; electrical improvements to include upgrading the existing PG&E service size to the main switchboard located in the Control Building, installing a new transformer, raceways, metering panel, new Motor Control Center (MCC), and associated wiring and components; interconnection with a pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system; installation of a new continuous backwash filter system to include excavation, shoring, and backfill for a partially buried cast-in-place concrete tank with three (3) equipped filter cells (modu

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.