FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Notice

North East River Maintenance Dredging, Cecil County, MD

Solicitation Notice Update to Post the Bid Abstract dated 25 August 2026 . Eastern Daylight Time (EDT) on 25 August 2026.

Notice typeSpecial Notice: An announcement, such as an industry day or a request for information.
Who's buyingW2sd Endist Baltimore, Dept of the Army
WhereWork location not listed. The buying office is in Baltimore, Maryland.
DeadlineNo deadline listed. Check the official posting.
Who the notice says can bidOnly small businesses can bid
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Estimated size$1 million to $5 million
Solicitation #W912DR26BA010
PostedWed, Aug 26, 2026
ContactLauren Elamenuel, [email protected]

Heads-up: Prevailing wage / wage determination applies · Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

Solicitation Notice Update to Post the Bid Abstract dated 25 August 2026 . **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel throu

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.