FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

CP20-4 Structural Coatings

The MOX Fuel Fabrication Facility (MFFF) will produce completed Mixed Oxide (MOX) fuel assemblies for use in domestic, commercial nuclear power reactors. Feed material is uranium dioxide and surplus plutonium dioxide.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
WhereAiken, South Carolina
DeadlineNo deadline listed. Check the official posting.
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 238320 (Painting and Wall Covering Contractors)
Solicitation #CP20-4StructuralCoatings
PostedMon, Apr 21, 2008
ContactJames D Detwiler, [email protected]

Open the official posting

From the notice

The MOX Fuel Fabrication Facility (MFFF) will produce completed Mixed Oxide (MOX) fuel assemblies for use in domestic, commercial nuclear power reactors. Feed material is uranium dioxide and surplus plutonium dioxide. The manufacturing area is the MOX Fuel Fabrication Building (BMF). It is a multi-functional complex containing all of the plutonium handling, fuel processing, and fuel fabrication operations of the MFFF. This Expression of Interest (EOI) is for the structural concrete decontaminable coatings that will be applied to floors walls and ceilings of the BMF. The Structural Coatings Subcontract is a Firm Fixed Unit Price type of subcontract that is estimated to be in excess of $9M. The BMF building is comprised of three main areas: the Mixed Oxide Processing Area (BMP), the Aqueous Polishing Area (BAP), and the Shipping and Receiving Area (BSR). The majority of the rooms in these areas have exposed concrete floors, walls and ceilings. The BMP contains 3 main floors with a basement area in the west end of the building. It has 309 rooms, all but 7 or which receive decontaminable coatings. The BAP contains 5 main floors. It has 226 rooms which all receive decontaminable coatings. The BSR contains 3 main floors with a partial basement for a cable spreading room under the ground floor. Only 5 of its 79 room will receive decontaminable coatings. Work areas will be released in stages as the building is constructed. Several mobilizations and demobilizations may be required. Th

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.