FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Coming soon

FY26 Willapa Harbor Maintenance Dredging

PRE-SOLICITATION NOTICE This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW071 Endist Seattle, Dept of the Army
WhereWashington
DeadlineSun, Nov 5, 2028 at 12:00 PM EST (744 days left)
Who can bidOpen to any business (no set-aside)
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Estimated size$5 million to $10 million
Solicitation #W912DW26Z1ATA
PostedFri, Oct 17, 2025
ContactGeraldine L. Kemp, [email protected]

Heads-up: Must be registered in SAM.gov

Open the official posting

From the notice

PRE-SOLICITATION NOTICE This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below. Construction Project: FY26 Willapa Harbor Maintenance Dredging Pre-solicitation Notice Number: W912DW26Z1ATA The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. The resulting contract will be firm-fixed-price. FY26 Willapa Harbor Maintenance Dredging Project Details: USACE Seattle District has a need for a construction dredging, project entitled FY26 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington: (1) the entrance to Tokeland Marina; (2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2026 and all in-water work must be completed by 15 Feb 2027. The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland). In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and t

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.