Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings.

Notice typeSolicitation: Open for bids now. Download the solicitation documents from the official posting.
Who's buyingW07v Endist New Orleans, Dept of the Army
WhereNew Orleans, Louisiana
DeadlineFri, Feb 5, 2027 at 3:00 PM EST (105 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Solicitation #W912P8-25-B-0025
PostedThu, Feb 6, 2025
Contactquinton b hamm, [email protected]

Open the official posting

From the notice

and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings. (The estimated time of completion is 135 calendar days after receipt of Notice to Proceed. The solicitation will include 5 drawings and specifications). No dike work is included with this project. The bid opening will be conducted virtually, please see Section 0010 for Instructions to Bidders.