FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2

On or about 23 October 2026, the Government intends to issue the Invitation for Bid (IFB) for LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT The IFB will close on or about 3 December 2026.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW071 Endist Omaha, Dept of the Army
WhereWork location not listed. The buying office is in Omaha, Nebraska.
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly small businesses can bid
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Solicitation #W9128F27BA007
PostedFri, Oct 16, 2026
ContactGrant Hibbs, [email protected]

Heads-up: Bonds required (bid / performance / payment) · Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

On or about 23 October 2026, the Government intends to issue the Invitation for Bid (IFB) for LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2. The IFB will close on or about 3 December 2026. This is a 100% Small Business Set-Aside. Sit Visit: A Site Visit is scheduled for 3 November 2026. Additional information regarding the site visit will be provided in the solicitation in Section 00 21 00. Project Description: Element 2 of the project includes the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, and the creation of a 200-by-1,500-foot island within Reach 4 of the lake, in water up to three feet deep. The island will be planted with cottonwood trees and other culturally significant vegetation. To protect the lakeward side of the island from wind, wave action, and ice erosion, a riprap revetment will be installed. The sheltered open water area between the island and the shoreline is anticipated to naturally evolve into approximately 5.17 acres of emergent wetland. Additionally, this measure will result in the creation of roughly 32 acres of riparian habitat. DO NOT submit requests for plans and specifications. See Obtaining Solicitation Documents below. Completion Date: The Contractor will be required to commence work upon receipt of contract award and complete the work 550 days after receipt of Notice to Proceed. This is subject to change after IFB issuance. Provisions will be included

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.