FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Coming soon

Nozzle,turbine,airc

Estimated issue date 5 Nov 2026 and estimated closing/response date 9 Dec 2026. Contracting Office Address: 3001 Staff Drive Tinker AFB, OK 73145

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingDla Aviation at Oklahoma City, Ok, Defense Logistics Agency
WhereWork location not listed. The buying office is in Tinker AFB, Oklahoma.
DeadlineTue, Nov 3, 2026 at 4:00 PM EST (11 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 336412 (Aircraft Engine and Engine Parts Manufacturing)
Solicitation #SPRTA1-27-R-0048
PostedMon, Oct 19, 2026
ContactAdrian Campos, [email protected]

Open the official posting

From the notice

Synopsis 1. Estimated issue date 5 Nov 2026 and estimated closing/response date 9 Dec 2026. 2. RFP #: SPRTA1-27-R-0048 3. Contracting Office Address: 3001 Staff Drive Tinker AFB, OK 73145 4. PR#: FD2030-27-00128 5. Nomenclature/Noun: NOZZLE,TURBINE,AIRC 6. NSN: 2840-01-597-5183 PR 7. PN: 9547M20G05 8. Application (Aircraft): F110 engine 9. AMC: 3/V 10. History: Last buy – Contract number SPE4A124G0014/SPRTA125F0328 Award Date 26 Sep 2025 to General Electric Company. 11. Description: Used to increase airflow velocity. 12. Dimensions: 31.5000 in. long X 31.5000 in. wide X 4.5000 in. high, weighing 35 lbs. 13. Material: Nickel 14. A firm fixed price contract is contemplated. The item, estimated quantities and required deliveries are as follows: Quantity: MIN 7 each / MAX 42 each LINE ITEM 0001: Destination: SW3211 Delivery: 28 EA ON OR BEFORE 31 July 2027 BEQ Required Quantity: 28 each 15. Qualified Sources: General Electric Company (Cage: 07482) 16. Set-aside: No Set-aside 17. Critical Safety Item (CSI) applicability: CSI criteria does APPLY to this item. 18. Mandatory Language: Electronic procedures will be used for this solicitation. Only written or faxed requests received directly from the requestors are acceptable. Note: An Ombudsman has been appointed to hear concerns from Offerors or potential Offerors during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.