Bonneville Powerhouse II Unwatering Pump Replacement

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW071 Endist Portland, Dept of the Army
WhereNorth Bonneville, Washington
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly small businesses can bid
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Estimated size$500K to $1 million
Solicitation #W9127N26BA018
PostedFri, Aug 21, 2026
ContactAragon Liebzeit, [email protected]

Heads-up: Must be registered in SAM.gov

Open the official posting

From the notice

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain