FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Sources sought

Sources Sought- Sources Sought & Other Transaction Authority (OTA) Construction for Non-Destructive Testing Facility, Red River Army Depot, Texas

SOURCES SOUGHT- MARKET RESEARCH ONLY Title: Non-Destructive Testing Facility Location: Red River Army Depot, Texas Scope: Construct an 8,000 SF Drive-through Depot Maintenance Shop for the non-destructive testing (NDT) of tactical vehicles, combat vehicles, and vehicle components.

Notice typeSources Sought: Market research. The agency wants to know who can do this work. Answering is free and can get the job set aside for small businesses.
Who's buyingW076 Endist Ft Worth, Dept of the Army
WhereTexas
DeadlineFri, Nov 13, 2026 at 3:00 PM EST (21 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 236220 (Commercial and Institutional Building Construction)
Solicitation #W9126G27RA020-P2_520249
PostedTue, Oct 13, 2026
ContactOctavia Gregory, [email protected]

Open the official posting

From the notice

SOURCES SOUGHT- MARKET RESEARCH ONLY Title: Non-Destructive Testing Facility Location: Red River Army Depot, Texas Scope: Construct an 8,000 SF Drive-through Depot Maintenance Shop for the non-destructive testing (NDT) of tactical vehicles, combat vehicles, and vehicle components. NDT is required to evaluate the integrity of welds, internal defects, structural capability, and condition of asset materials. The facility will include radiation protective shielding to allow for the existing x-ray equipment to be safely utilized at full potential and permit upgrades and improvements to the industrial x-ray system. The building will also facilitate the consolidation, expanded capability, as well as training for other NDT equipment including ultrasonic, dye penetrant, magnetic particle inspection, and laser scanning operations. The existing x-ray facility will be demolished. The Target Price Range (TPR): The Government has established a TPR for construction estimated to be between $8,000,000 and $8,500,000. The Construction Cost Limit (CCL) is estimated at $8,175,103.00 with a total Programmed Amount (PA) of $8,100,000. FY27 AWARD "Please refer to Attachment 01 for detailed project information. Interested vendors must complete the Market Intelligence Report: Industry Day/First Look Questionnaire and are strongly encouraged to include a capability statement." We have established a ProjNet, https://www.projnet.org/projnet for additional inquires and questions. ProjNet-Project ID Numbe

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.