FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Open bid

Wiring Harness, Branched

Estimated issue date and estimated closing/response date: Issue: October 21, 2026 Closes: November 20, 2026 RFP# SPRTA1-27-R-0025 Request for Proposal

Notice typeSolicitation: Open for bids now. Download the solicitation documents from the official posting.
Who's buyingDla Aviation at Oklahoma City, Ok, Defense Logistics Agency
WhereWork location not listed. The buying office is in Tinker AFB, Oklahoma.
DeadlineFri, Nov 20, 2026 at 5:00 PM EST (28 days left)
Who can bidOpen to any business (no set-aside)
IndustryNAICS 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing)
Solicitation #SPRTA1-27-R-0025
PostedWed, Oct 21, 2026
ContactChrissy Turnage, [email protected]

Open the official posting

From the notice

Synopsis PR: FD2030-27-00026 1. Estimated issue date and estimated closing/response date: Issue: October 21, 2026 Closes: November 20, 2026 2. RFP# SPRTA1-27-R-0025 Request for Proposal 3. Service/Spare/Repair/OH: Spares 4. AMC: 3/R 5. Nomenclature/Noun: Wiring Harness, Branched 6. NSN: 6150-01-211-8062 7. PN: 713447E 8. History: 2 Mar 2026, 17 each, Hamilton Sundstrand Corporation, (99167) 9. Description/Function: Wiring Harness, Branched. DIMENSIONS, 6.5 INCH (L) BY 3.5 INCH (W) BY 6.0 INCH (H). 4.0 POUNDS (WEIGHT). MATERIAL CONTENT, Steel alloy, magnesium alloy, plastics, copper, and teflon. Governor portion regulates CSD output speed, switches relay temperature and oil pressure to the engineering panel. APPL. TO B-1. 10. Total Line Item Quantity: L/I 0001 33 Each (Range: 9-50) 11. Application (Engine or Aircraft): B-1 12. Destination: Ship to SW3211, Tinker AFB, OK 13. Required Delivery: On or Before 30 Oct 2027 14. Qualification Requirements: Contractor must be an approved source. 15. Export Control Requirements: No 16. UID: UID requirements will apply. 17. Qualified Sources: Hamilton Sundstrand Corporation (CAGE 99167) 18. Set-aside: This acquisition will not be set aside. 19. Surplus: Surplus is not authorized. 20. Mandatory Language: The Government does not own the data or the rights to the data needed to manufacture this item. Firms interested in participating in this procurement are encouraged to contact the OEM to inquire about the data or rights to the data. In ac

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.