FiftyBidsGovernment contracts and grants, in one plain-English search.

Back to search

Sources sought

F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part.

Notice typeSources Sought: Market research. The agency wants to know who can do this work. Answering is free and can get the job set aside for small businesses.
Who's buyingF3yccf 448 Scmw, Dept of the Air Force
WhereTinker AFB, Oklahoma
DeadlineTue, Dec 1, 2026 at 12:00 AM EST (39 days left)
Who can bidOpen to any business (no set-aside listed)
Solicitation #F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
PostedThu, Mar 13, 2025
ContactTracey Beringer, [email protected]

Open the official posting

From the notice

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within t

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.