FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 124, 120

Solicitation 36C26026R0100 for project 531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 120, 124 is estimated to be posted to Federal Contracting Opportunities on or about July 24, 2026, with an estimated closing date on or about August 7, 2026. This will be 100% SDVOSB set-aside.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buying260-Network Contract Office 20 (36c260), Veterans Affairs, Department of
WhereBoise, Idaho
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly service-disabled veteran-owned small businesses can bid
IndustryNAICS 238320 (Painting and Wall Covering Contractors)
Solicitation #36C26026R0100
PostedFri, Jul 17, 2026
ContactCharlene Johnson, [email protected]

Open the official posting

From the notice

Solicitation 36C26026R0100 for project 531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 120, 124 is estimated to be posted to Federal Contracting Opportunities on or about July 24, 2026, with an estimated closing date on or about August 7, 2026. This will be 100% SDVOSB set-aside. The scope of this project includes all necessary labor, materials, equipment, supervision, and incidentals to prepare and paint designated exterior buildings elements at the Boise VA Medical Center, 500 West Fort Street, Boise, ID 83702. All work shall conform to the Statement of Work, manufacturer specifications, and applicable VA standards. General Requirements Prepare, prime (as required), and apply finish coats to all specified surfaces per manufacturer instructions and VA/industry best practices. Match existing colors unless otherwise directed in writing Protect adjacent surfaces, landscaping, vehicles, pedestrians, and during painting operations. Repair, at no cost to the Government, any damage resulting from Contractor activities to equal or better than the original condition. Coordinate all work hours, site access, equipment staging, and safety/security measures with the COR and Facility Engineering Service prior to commencing work. Surface Preparation All Areas Clean all surfaces to remove dirt, mildew, loose coatings, rust, grease, and other contaminants using approved methods (hand tools, power washing, detergent, or solvent cleaning). Scrape and sand areas of loose or peeling pai

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.