FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida

The work consists of rehabilitation of the South Jetty at Palm Beach Harbor. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking within the tolerances provided.

Notice typeSolicitation: Open for bids now. Download the solicitation documents from the official posting.
Who's buyingW074 Endist Jacksnvlle, Dept of the Army
WhereWork location not listed. The buying office is in Jacksonville, Florida.
DeadlineMon, Oct 26, 2026 at 1:00 PM EDT (3 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Estimated size$1 million to $5 million
Solicitation #W912EP26BA019
PostedWed, Oct 21, 2026
ContactGuesley Leger, [email protected]

Heads-up: Must be registered in SAM.gov

Open the official posting

From the notice

The work consists of rehabilitation of the South Jetty at Palm Beach Harbor. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking within the tolerances provided. Mobilization of equipment and the construction necessary to repair the jetty must be water-based and require the use of marine construction methods and equipment. Work on top of the jetty will be permitted. Land-based access to the project site will not be permitted. Rehabilitation also consists of concrete repairs to the South Jetty at Palm Beach Harbor as indicated on the drawings. Prior to work on the jetty, conduct a pre-construction benthic community survey on the jetty structure and any adjacent submerged areas that may be impacted by the Contractors operations. Complete any coral relocations required as a result of the benthic survey prior to jetty work. Field personnel conducting coral survey and transplantation activities must either be qualified relocation contractors by the Florida Fish and Wildlife Conservation Commission or must provide documentation of having successfully conducted relocation of corals in Florida. The project will have an estimated period of performance of 330 calendar days after receipt of the Notice to Proceed (NTP). The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and three options as follows: The Estimated Magnitude of construction is between $1,000,000.

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.