Sources sought

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services for the for the repairing of the inlet pipe to the float well and replace weathered/damaged staff gauges at the Surry Moutain Lake Dam in Surry NH.

Notice typeSources Sought: Market research. The agency wants to know who can do this work. Answering is free and can get the job set aside for small businesses.
Who's buyingW2sd Endist New England, Dept of the Army
WhereSurry, New Hampshire
DeadlineMon, Nov 23, 2026 at 1:00 PM EST (31 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Solicitation #W912WJ27X1CTD
PostedWed, Oct 21, 2026
ContactKyle Hall, [email protected]

Heads-up: Bonds required (bid / performance / payment)

Open the official posting

From the notice

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services for the for the repairing of the inlet pipe to the float well and replace weathered/damaged staff gauges at the Surry Moutain Lake Dam in Surry NH. This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project. The NAICS code for this procurement is 237990 with a size standard of $45M. The project is planned to be solicited in the Winter of 2026 with construction to begin place in the Summer of 2027. The estimated construction cost is between $350,000 - $500,000. The project site is the inlet culvert on the lake side of the Surry Mountain Dam in Surry, NH. Work for this project will likely include, but not be limited to, the following: Coffer dam at inlet pipe location. Float well pipe (3-inch cast iron) cleaning. Installation of internal liner for float well pipe. Pre and Post liner installation CCTV inspections. Repairs to the slash-zone pipe segment Protection and concrete encasement of the external float well pipe Staff Gauges: Pressure treated posts with attached enamel coated metal measuring strip. Scheduled work will be affected by depth of pool. Assumed low pool depths are July and August (when work can be conducted safely), but adverse weather conditions (rain events) could delay or postpone work schedules. Surry Mountain staff w