FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Sources sought

NRM A/E- 528A7-27-112 Fire Alarm Panel Upgrade

This is a "REQUEST FOR INFORMATION" only. The purpose of this notice is to obtain information regarding the availability and capability of qualified sources to perform a potential requirement.

Notice typeSources Sought: Market research. The agency wants to know who can do this work. Answering is free and can get the job set aside for small businesses.
Who's buying242-Network Contract Office 02 (36c242), Veterans Affairs, Department of
WhereSyracuse, New York
DeadlineTue, Nov 3, 2026 at 10:00 AM EST (11 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 541330 (Engineering Services)
Solicitation #36C24227Q0070
PostedTue, Oct 20, 2026
ContactRyan Seburn, [email protected]

Open the official posting

From the notice

This is a "REQUEST FOR INFORMATION" only. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding the availability and capability of qualified sources to perform a potential requirement. This notice does not constitute a commitment by the Government, and no contract will be awarded from this notice. Responses to this Sources Sought notice must be in writing. The Department of Veterans Affairs is seeking qualified Architect-Engineer (A/E) firms to provide complete design and cost estimation services to upgrade the existing obsolete Edwards EST-3 fire alarm system (Project No. 528A7-24-112) at the Syracuse VA Medical Center located at 800 Irving Avenue, Syracuse, NY 13210. Work includes upgrading the existing fire alarm control panels and remote annunciators, installing a new fiber loop network connecting all panels and a new master control panel, expanding the addressable system to additional campus buildings, removing the existing fireman telephone system, and developing a phasing plan that maintains continuous fire alarm protection throughout construction. The A/E shall prepare complete working drawings, specifications, and detailed cost estimates, and provide construction period services. All drawings must be stamped by a registered Fire Protection Engineer (FPE), and the prime firm must have an FPE on staff no exceptions. Design shall comply with the latest editions of NFPA 70, NFPA 72, and

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.