FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

CO BR UCPO Blue Mesa Road(1) Blue Mesa Road

PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buying6982af Central Federal Lands Divisi, Federal Highway Administration
WhereGunnison, Colorado
DeadlineNo deadline listed. Check the official posting.
Who can bidOnly small businesses can bid
IndustryNAICS 237310 (Highway, Street, and Bridge Construction)
Solicitation #6982AF27B000009
PostedTue, Oct 20, 2026
ContactStephanie Navarro, [email protected]

Heads-up: Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule A

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.