FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

Combat Rescue Helicopter (crh) Simulator Facility, Jber, Alaska (JBE089)

This is a pre-solicitation notice for a 100% Small Business Set Aside Request for Proposals (RFP) to construct a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) facility utilizing conventional design and construction methods to accommodate the mission of the facility.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW2sn Endist Alaska, Dept of the Army
WhereJber, Alaska
DeadlineFri, Oct 23, 2026 at 6:00 PM EDT (due TODAY)
Who can bidOnly small businesses can bid
IndustryNAICS 236220 (Commercial and Institutional Building Construction)
Estimated size$17 million to $22 million
Solicitation #W911KB27RA009
PostedMon, Oct 5, 2026
ContactCatherine Williams, [email protected]

Heads-up: Prevailing wage / wage determination applies · Must be registered in SAM.gov

Open the official posting

From the notice

This is a pre-solicitation notice for a 100% Small Business Set Aside Request for Proposals (RFP) to construct a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) facility utilizing conventional design and construction methods to accommodate the mission of the facility. The work includes construction of a new, properly sited, single floor, 8,202 square foot Combat Rescue Helicopter Simulator Facility that is fully configured. The new building will support the simulator for the HH-60W helicopter, its supporting equipment, briefing/debriefing room, mission planning room, instructors' office, administrative office, building support rooms, and toilet facilities. The facility will be slab on grade foundation with cold weather-insulated, shallow continuous strip footings, and a thickened cold weather-insulated mat foundation will be located directly below the simulator equipment. The exterior shell of the Simulator Bay will have masonry veneer and metal panel on reinforced concrete masonry units (CMU). The one-story administration areas will be constructed of masonry veneer and metal panel on metal studs. The roof will be low slope standing seam structural metal roofing, with snow guards to provide mitigation of sliding snow. The simulator bay and associated areas will be constructed to collateral secret open storage criteria. There will be a large overhead door into the simulator bay which will also feature an interior overhead crane to move equipment. The work also

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.