Back to search
Open bid
657-27-107JC, Replace Select Hot Water Heating System
Sections in bold red text indicate changes in response to RFIs that mainly address non-technical RFIs. All responses to technical RFIs can be found on the attachment lableld response to pre-proposal RFIs.
Heads-up: Prevailing wage / wage determination applies
Open the official posting
From the notice
Amendment 36C25526R0166_1 0002 Purpose: a) To incorporate Governents response to Pre-proposal RFIs, b) Change NAICS code from 236220 to 238220 & Size standard from $45.0M to 19.0M. c) change proposal due date from 10-16-2026 to 11-03-2026. d) Final RFIs for Government response are due 10-20-2026 by 2PM CST. e) Replace design manual with plumbing manual. f) Incorporate revised specifications. g) Update Wage Determination for STL MO Due to the volume of RFIs recieved, a copy of an updated solicitation has been uploaded to address non-technocal RFIs. Sections in bold red text indicate changes in response to RFIs that mainly address non-technical RFIs. All responses to technical RFIs can be found on the attachment lableld response to pre-proposal RFIs. Notice 1 & 2 do not require acknowledgement. Only amendments 1, 2 and any subsequent amendments that are issued require acknowledgment on proposal submissions. Please see attachement section Amendment 36C25526R0166_1 0001 Purpose: The site-visit sign-in sheet and RFI questions are incorporated. Please see attachement section for sign in sheet and RFIs. Notice 2: 36C25526R0166_1 Purpose: The design manual attached also serves as the specifications for this solicitation. The solicitation can be accessed in the attachment section. Notice :1 36C25526R0166_1 Purpose: VA Notice of Limitations on Subcontracting Attachment applies to this solicitation. Please see attachments section. Please reponsed by the specified date and time for consi
We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.