FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

John Day Dam Powerhouse HVAC Upgrades

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW071 Endist Portland, Dept of the Army
WhereRufus, Oregon
DeadlineNo deadline listed. Check the official posting.
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors)
Estimated size$25 million to $100 million
Solicitation #W9127N26BA006
PostedThu, Oct 1, 2026
ContactAragon Liebzeit, [email protected]

Heads-up: Must be registered in SAM.gov

Open the official posting

From the notice

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1–14 located in Sherman County, Oregon, and Units 15–16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throu

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.