FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

Maintenance, Repair and Preservation of IX-551

The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of IX-551.

Notice typeCombined Synopsis/Solicitation: Open for bids now. Everything you need to respond is in this notice.
Who's buyingPuget Sound Naval Shipyard Imf, Dept of the Navy
WhereWork location not listed. The buying office is in Bremerton, Washington.
DeadlineWed, Oct 28, 2026 at 3:00 PM EDT (5 days left)
Who can bidOpen to any business (no set-aside listed)
IndustryNAICS 336611 (Ship Building and Repairing)
Solicitation #N4523A26Q1004
PostedMon, Sep 21, 2026
ContactJeff Jaeckel, [email protected]

Open the official posting

From the notice

The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of IX-551. The IX-551 characteristics are Length: 260 FT, Width: 85 FT, Age: 10 Years, Hull Type: Steel, Draft: 8 FT 6 IN, Full Displacement: 3,070 L Tons and Light Load: 2,267 L Tons. The Contractors facility must possess the capability of IX-551 with the dimensions as stated above. To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. Scope Overview: Coordinate with the Contracting Officer, via the SUPERVISOR to deliver the Asset to the Contractors facility. Upon docking the Asset, wash, and clean the exterior surfaces of the Asset. Blast and preserve all exterior hull surfaces, underwater body, freeboard, moon pools and bulwark surfaces of the Asset. Fill, drain, air test, inspect each underwater skeg on the Asset. Accomplish visual inspections of hull and body and all tank/voids. Remove existing and install new zinc anodes and hardware on the underwater hull. Shift the Asset on the blocks to achieve 100 percent preservation of underwater hull. Apply non-skid system to main deck and 02/03 level decks. Accomplish preliminary and final air

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.