FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

USCGC Smilax Crane Service

STATEMENT OF WORK (SOW) FOR USCGC SMILAX Crane ServiceSMILAX bent a support lattice on the CG300 crane and is in need for rental crane services for tasks outlined in this Statement of Work (SOW).

Notice typeCombined Synopsis/Solicitation: Open for bids now. Everything you need to respond is in this notice.
Who's buyingCg-Sea-C22, US Coast Guard
WhereAtlantic Beach, North Carolina
DeadlineMon, Oct 26, 2026 at 11:00 AM EDT (3 days left)
Who can bidOnly small businesses can bid
IndustryNAICS 336611 (Ship Building and Repairing)
Solicitation #70ZU0227Q0000093
PostedTue, Oct 20, 2026
ContactJustin Wooldridge, [email protected]

Open the official posting

From the notice

STATEMENT OF WORK (SOW) FOR USCGC SMILAX Crane ServiceSMILAX bent a support lattice on the CG300 crane and is in need for rental crane services for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL 1.1 BACKGROUND The 100' WLIC asset, USCGC SMILAX, has a bent the lattice on the upper section of the CG300 and requesters a crane and qualified rigger that can lift the boom off to the pier and replace it with a new 8500 LB 720in x 70inx 70in boom section being provided by Sparrows. 1.2 SCOPE The scope of this contract is defined by the efforts and tools required to support USCGC SMILAX. The Contractor shall provide all labor, materials, and tools necessary to lift, up to 8500 lb boom off the Cutter and back onto the Cutter 1.3 OBJECTIVE The goal is to return CGC SMILAX CG300 to designed system parameters. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: 2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC 2.1 Boom lift - Remove boom from cutter.The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. 2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Cre

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.