FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

OK FW TSM 10(1) NFH Entrance Road and Parking Improvements

PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of…

Notice typeSolicitation: Open for bids now. Download the solicitation documents from the official posting.
Who's buying6982af Central Federal Lands Divisi, Federal Highway Administration
WhereTishomingo, Oklahoma
DeadlineThu, Nov 12, 2026 at 4:00 PM EST (20 days left)
Who can bidOnly small businesses can bid
IndustryNAICS 237310 (Highway, Street, and Bridge Construction)
Solicitation #6982AF27B000003
PostedTue, Oct 6, 2026
ContactEric Grosskreuz, [email protected]

Open the official posting

From the notice

PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.