FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

Mdc Brooklyn - Remove and Replace Shower Partitions

This announcement constitutes as the only solicitation; quotes are being requested and a written solicitation is issued (see attached). You are required to provide all pages of the written attached solicitation with your complete quotation.

Notice typeCombined Synopsis/Solicitation: Open for bids now. Everything you need to respond is in this notice.
Who's buyingMdc Brooklyn, Federal Prison System / Bureau of Prisons
WhereBrooklyn, New York
DeadlineFri, Nov 13, 2026 at 12:00 PM EST (21 days left)
Who can bidOnly small businesses can bid
IndustryNAICS 332913 (Plumbing Fixture Fitting and Trim Manufacturing)
Estimated size$100K to $250K
Solicitation #15BBR027Q00000003
PostedTue, Oct 20, 2026
ContactBRIAN RODRIGUEZ, [email protected]

Heads-up: Bonds required (bid / performance / payment) · Site visit or pre-bid meeting mentioned · Must be registered in SAM.gov · Brand-name or equal product

Open the official posting

From the notice

This is a combined synopsis/solicitation for commercial construction for MDC Brooklyn located at 80 29th Street Brooklyn, NY, 11232, and is prepared in accordance with the format in subpart FAR Revision Subpart 12.202(b)(1), as supplemented with additional information included in this notice. This announcement constitutes as the only solicitation; quotes are being requested and a written solicitation is issued (see attached). You are required to provide all pages of the written attached solicitation with your complete quotation. The Federal Bureau of Prisons (BOP) anticipates issuance of solicitation 15BBR027Q00000003 for the award of a firm fixed-price construction contract titled REMOVE AND REPLACE SHOWER PARTITIONS at the Metropolitan Detention Center in Brooklyn, NY. MDC Brooklyn is a federal correctional facility located at 80 29th Street Brooklyn, NY 11232. The contractor is responsible to provide all equipment and labor to remove and replace all existing shower partitions (with attached changing rooms) and bathroom stall partitions on the 2nd, 3rd, 4th, 5th, and 6th floors of the East Building at MDC Brooklyn. Each floor contains a North and South side, and each side includes: 6-bathroom stalls 7- shower stalls with changing rooms Changing rooms shall be 39.5 inches deep and include a door All partitions shall be floor- and overhead braced. Materials and finishes shall include: Powder-coated steel partitions 58-inch doors and panels Chrome zamac hardware Silver Vein co

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.