Back to search
Coming soon
VANIHCS SPS Water Testing (VA-27-00000760)
STATEMENT OF WORK Sterile Processing Service ST-108 Testing Requirements Upgrade The contractor shall provide all the following for testing the water for/within SPS per the ANSI/AAMI ST108:2023 at the Marion, Fort Wayne, and Jackie Walorski VA sites as defined in this Statement of Work (SOW).
Open the official posting
From the notice
STATEMENT OF WORK Sterile Processing Service ST-108 Testing Requirements Upgrade The contractor shall provide all the following for testing the water for/within SPS per the ANSI/AAMI ST108:2023 at the Marion, Fort Wayne, and Jackie Walorski VA sites as defined in this Statement of Work (SOW). WORK TO BE PERFORMED: Contractor shall provide all labor, materials, equipment, transportation, lodging, and supervision necessary to collect appropriate samples and deliver to a lab meeting the requirements for processing of AAMI ST108. Contractor shall calibrate the conductivity/resistivity meter monthly during their testing visit and provide a water analysis report. The contractor will be part of the multidisciplinary team that assists the water working group with resolving out-of-range water testing, in addition to: Serves as the subject matter expert on water testing per the ST108:2023 Serves as the subject matter expert on corrective actions to mitigate risks for out-of-range water testing parameters. Completes monthly, quarterly, and yearly testing per ST108:2023 and the VHA water contract/SOW. Completes performance qualification testing per the ST108:2023 and per the VHA contract/SOW. The contractor must report any outliers identified during testing within 24 hours of receiving laboratory results. Completes follow-up testing as ordered by engineering for out-of-range water parameters per the ST108:2023 and VHA water contract/SOW. The contractor shall provide VA end users with acc
We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.