FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Coming soon

Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, Hawaii

This PRESOLICITATION NOTICE is posted in accordance with RFO Subpart 5.1.

Notice typePresolicitation: Heads-up: the agency plans to post a bid soon. Get ready now.
Who's buyingW2sn Endist Honolulu, Dept of the Army
WhereHaleiwa, Hawaii
DeadlineTue, Nov 10, 2026 at 7:00 PM EST (18 days left)
Who can bidOpen to any business (no set-aside)
IndustryNAICS 237990 (Other Heavy and Civil Engineering Construction)
Solicitation #W9128A26BA002
PostedTue, Jun 23, 2026
ContactJenna Lum, [email protected]

Heads-up: Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

This PRESOLICITATION NOTICE is posted in accordance with RFO Subpart 5.1. The U.S. Army Corps of Engineers, Honolulu District hereby announces its intent to issue an unrestricted solicitation for a Design-Bid-Build construction project entitled, “Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, Hawaii.” The Government intends to award a firm fixed-price construction contract utilizing Sealed Bidding procedures prescribed at RFO Part 14. Project Description: Conduct maintenance dredging by mechanical clamshell dredge to remove shoaled material within the harbor Federal limits that have accumulated over time. Maintenance dredging is needed to restore Haleiwa Harbor to its authorized depths [-12 ft Mean Lower Low Water (MLLW)] and ensure continued safe vessel navigation. The project also includes repairs to selected areas of the revetted mole structure, including small vegetation removal, removal of two large trees, filling voids in armor stone layer, and resetting an approximately 130-foot section of the revetted mole armor layer. The major elements of this project include: pre-mobilization activities; compliance with all applicable environmental requirements; mobilization, which includes preparation of temporary construction staging; mechanical clamshell dredging of accumulated sediments estimated at 4,260 cubic yards (CY); transportation and disposal of material to the South Oahu Offshore Dredged Material Disposal Site; revetted mole rep

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.