FiftyBidsGovernment contracts and grants, sent to your inbox.

Back to search

Open bid

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.

Notice typeSolicitation: Open for bids now. Download the solicitation documents from the official posting.
Who's buyingFermilab - DOE Contractor, Energy, Department of
WhereBatavia, Illinois
DeadlineTue, Nov 17, 2026 at 5:00 PM EST (25 days left)
Who can bidOpen to any business (no set-aside)
IndustryNAICS 236210 (Industrial Building Construction)
Solicitation #RFP-376508-CD
PostedWed, Oct 7, 2026
ContactChris Daley, [email protected]

Heads-up: Bonds required (bid / performance / payment) · Site visit or pre-bid meeting mentioned

Open the official posting

From the notice

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within

We may have shortened this. The official posting is the record. We are not affiliated with the agency that published it.